JrvsOS Manufacturing

One plant. One OS. Run operations, maintenance, quality, energy and supply on one foundation.

rvsOS Manufacturing connects your historian, MES, lab, maintenance and ERP into one plant model, so every team works from the same data, sees the same loss, and knows what each scenario is worth.

One plant.

Ten short films.

Sample data from a fictional pulp and paper mill. One loss shows up in several films, so the figures are not added together.

Sample data from a fictional pulp and paper mill. One loss shows up in several films, so the figures are not added together.

$8.57M

Margin lost in 90 days at one sample plant, measured against the best its own lines have already done.

$2.13M

Lost to unplanned stops in the same 90 days, with the warnings that came before the work orders.

16 days

Between an operator’s logbook warning and the corrective work order, in the same sample.

Built on ISA-95: site, area, line, machine. One vertical OS, for every team in the plant.

Every team sees its own slice.

Tags live in the historian, stops in the MES, results in the LIMS, work orders in SAP or Maximo, and warnings in the logbook. The losses that cost the most cross all of them, so nobody owns them.

Operations sees the stops

But not the inspection waiting for approval behind them.

Maintenance sees the backlog

But not the margin each overdue job is costing.

Finance sees the cost per tonne

A month later, with no root cause attached.

One OS, every scenario.

Each scenario runs on the same plant model and belongs to the team that acts on it. Start with one; the next one costs less because the data is already connected. Each one has its own one-minute film.

Plant Leadership

Margin Leakage

$8.57M

Lost in 90 days against the plant’s own best: 5.8% of margin, about $34.7M a year.

Operations

OEE & Throughput

85.6%

76.9%

One paper machine’s OEE, with breaks up from 1.7 to 2.4 a day.

Maintenance

Reliability

$2.13M

Lost to unplanned stops in 90 days; one inspection 42 days overdue.

Process Engineering

Root cause

$533,303

One loss episode traced to the first signal that moved, with the A3 drafted.

Process Engineering

Recipe Conformance

21 days

Freeness out of recipe, with starch raised to compensate.

Quality

Yield & Quality

$2.54M

Yield lost in 90 days, including $1.01M of downgraded pulp on one machine.

Energy

Energy

$353k

Above best in 90 days; utilities from $10.46 to $13.67 a tonne in one month.

Procurement

Supply & Materials

$683k vs $229k

Saved on cheaper chips; then 8 of 45 deliveries failed the lab and the loss followed.

Process Engineering

Chemicals

$461k

Off-grade pulp in five days, while a failing methanol valve upset the bleach plant.

One worn plate, every department.

Every team saw a piece of it. JrvsOS sees all of it, on one timeline, because every scenario sits on the same plant model.

$533,303

One loss episode, seen across five scenarios. Sample data.

1 Sep · Maintenance

The refiner plate inspection is due, and waits for approval.

7 Sep · Process data

The refiner’s plate gap moves: the first signal upstream of the paper machine.

12 Sep · Operations

An operator logs “R2 amps low, can’t get load up.”

Recipe and quality

Freeness goes out of recipe for 21 days. Starch is raised. Breaks go from 1.7 to 2.4 a day.

28 Sep · Maintenance

The corrective work order is raised, 16 days after the warning.

What changes for every team in the plant.

Margin leakage screenshot

Sample data

See your margin leak in dollars

Every line and grade is measured against its own best demonstrated rate and intensity. Leadership sees which leaks are still running, and what each one costs.

Margin Leakage • $8,567,242 lost in 90 days; the biggest leak still running is $877,753 of sheet breaks.

Reliability screenshot

Sample data

Act on the warning, not the failure

Reliability puts the cost on each piece of equipment and shows the warnings that came before the corrective work, in the operators’ own words.

Reliability • $2.13M lost to unplanned stops; the first warning on the refiner came 16 days before the work order.

RCA workbench screenshot

Sample data

Find what moved first

The RCA Workbench checks every tag, lab test and alarm upstream of a loss and finds the first thing that changed, then drafts the A3 with the evidence.

RCA Workbench • 15 signals ranked; the refiner’s plate gap moved first, on 7 Sep.

Ask Jrvs screenshot

Sample data

Ask about anything in the plant

Jrvs answers from the same plant model every app uses, and cites its source. AI reads and navigates. Fixed rules produce every recorded figure. People decide.

Ask Jrvs: “Why is the paper machine losing margin?” It answers from the tags, the logbook and the work orders.

Start with the scenario that pays first.

Start with one scenario

1 to 2 weeks

Margin Leakage on one line, over the last 90 days. You see your own number against your own best, with the evidence.

Run it every shift

One quarter to go live

The scenario runs on every shift. Each leak reaches its owner while it’s still small.

Add the next scenario

Each one pays for the next

Root cause, reliability, energy or supply, on the same plant model. Nothing commits you to the next step.

Keep your systems. Add the checks.

JrvsOS works alongside your historian, MES, LIMS, SAP and Maximo, connecting them into one plant model and bringing each team what it needs to act on. Nothing touches the control system.

Questions plant leaders ask.

Do we have to replace our MES or our historian?

No. JrvsOS works on top of the systems you run today. It reads the historian, the MES, the lab and the work orders, and nothing touches the control system.

How is an operating system different from OEE or APM tools?

How fast do we see a result?

Who makes the decisions, the AI or my team?

Where does our data go?

What does it cost?

Show us your invoices. We show you the leakage.

See JrvsOS run a sample plant in a live demo, from the margin leak to the root cause. Then we run your first scenario on one of your lines.

One Plant, One OS webinar: [DAY, DATE], 60 minutes online.

Copyright © 2026 Jarvis Consulting Group. All Rights Reserved